Posted: Friday, September 25
Overnight paving on the Lions Gate Bridge and the Stanley Park Causeway will take place September 27 – 29.
During this time:
• Northbound traffic - One lane will remain open
• Southbound traffic - All lanes will be closed between 11:00 pm and 6:00 am with traffic rerouted via Highway 1 Ironworker’s Memorial Bridge
Customers travelling to or from Horseshoe Bay terminal around these times should expect delays and plan for additional travel time. Traffic control will be in place throughout the work zone; please abide by traffic devices and personnel.
The paving work schedule is dependent on weather and may change. Please check DriveBC for the latest road conditions and closure updates here.
For up-to-date sailing and departure information, check Current Conditions, follow @BCFerries on X, or phone 1-888-223-3779 for further assistance.
Available vehicle space
Reservations not checked-in
All vehicles checked-in
Current conditions
Last Updated:4:36 PM Refresh details
Nanaimo (Duke Point) to
Vancouver (Tsawwassen)
View service notices
Sailing Status
Arrived & underway
Upcoming
Next sailing with vehicle space
Estimated space doesn't include vehicles outside the terminal waiting to buy a ticket.
On time
20% Available vehicle space
On time
64% Available vehicle space Details
On time
26% Available vehicle space Details
On time
69% Available vehicle space Details
Tomorrow
Tomorrow
38% Available vehicle space
Tomorrow
30% Available vehicle space
Tomorrow
12% Available vehicle space
Terminal cameras
Use our terminal cameras to check traffic and weather conditions at the terminal.
Last updated:4:36 PM Refresh
Traffic at the terminal
Traffic to Vancouver (Tsawwassen)
Ferry tracking
See where our ferries are right now and watch them navigate coastal BC with our tracking maps.
Nanaimo (Duke Point) to
Vancouver (Tsawwassen)
Terminal info & parking
Nanaimo (Duke Point)# 400 Duke Point Highway, Nanaimo, V9X 1H6