Travel advisory: RBC GranFondo Whistler View ×

Posted: Tuesday, September 8 at 11:38 am

RBC GranFondo
Horseshoe Bay Sailings

Saturday, September 12, 2026

The RBC GranFondo Whistler cycling event from downtown Vancouver to Whistler will take place on Saturday, September 12. Traffic modifications will be in effect for customers travelling through the Horseshoe Bay terminal before 9:30 am on that day.

Customers planning to travel on sailings departing Horseshoe Bay on the morning of Saturday, September 12, please note that Westbound Highway 1 and northbound Highway 99 traffic will be rerouted via Exit 2 to Old Highway 99, also known as Horseshoe Bay Drive, and will re-enter northbound Highway 99 at Pasco Road.

The detour will be in effect from 5:30 am to 10:30 am. We suggest customers allow enough travel time to arrive at the terminal before the scheduled sailing of their choice.

For customers travelling on sailings that arrive at Horseshoe Bay terminal before 9:00 am on September 12, traffic leaving Horseshoe Bay will be rerouted to Marine Drive through West Vancouver from 5:30 am to 9:00 am.

Eastbound heavy trucks travelling between Horseshoe Bay, Taylor Way, and southbound Highway 99 will be redirected to a temporary holding area in Horseshoe Bay from 5:30 am to 9:00 am.

Heavy trucks will not be permitted on Marine Drive through West Vancouver during this period and may re-enter Highway 1 after the eastbound lanes reopen.

BC Ferries wishes all the participants success in the RBC GranFondo Whistler event. For further information about the revised traffic patterns, visit RBCGranfondo.

For up-to-date sailing and departure information, check Current Conditions, follow @BCFerries on X, or phone 1-888-223-3779 for further assistance.

Read more

Competition has expired or doesn't exist


Active competitions

Tail Shaft Support Services

Published: September 08, 2026

Closing Date: August 31, 2036

92797 - TSA Quay HVAC Replacement Project

Published: September 04, 2026

Closing Date: October 02, 2026

92247 Departure Bay Berth 3 Supply, Fabrication, and Delivery of Counterweight Cable Assemblies

Published: August 26, 2026

Closing Date: September 21, 2026

Supply and Installation of a Transitional Emergency Battery System

Published: August 24, 2026

Closing Date: September 28, 2026

Island Class Terminal Electrification Program, Construction Manager at Risk Services

Published: August 04, 2026

Closing Date: September 17, 2026

Acquisition of Retired Ferry Vessels

Published: July 28, 2026

Closing Date: September 30, 2026

Water Taxi Services on BC Ferries Routes 3, 4, 6, 8, 18, 19, 20, 21, 22, 23, 24, 25, 26 and 28a

Published: April 09, 2026

Closing Date: March 31, 2036

Baynes Sound Connector Bull Wheels and Shafts

Published: April 25, 2025

Closing Date: May 21, 2028

Notices of Substantial Performance

No notices of substantial performance found
Very weak Weak Medium Strong Very strong password.strength.unsafepwd Too short Use %d - %m characters with a mix of upper case letters, lower case letters, numbers & symbols (do not use < > / ' or &) 8 32 Password must be more than eight characters and contain a mix of any three of the following: upper case letters, numbers and symbols. Password must be less than 32 characters and contain a mix of any three of the following: upper case letters, numbers and symbols. Enter current password Enter valid email address Password not valid Select account type Enter first name Enter last name Confirm Email Not Valid Password must be more than eight characters and contain a mix of any three of the following: upper case letters, numbers and symbols. Passwords do not match Enter valid postal/zip code Loading... Please wait... Stores loaded View schedule from View sailing status from Discover our routes from to